| Need to add soap dishes and accent...then the grout... |
Sunday, August 31, 2014
Bathtub Tile Getting There...
Saturday, August 23, 2014
Tiling Preparation Commences
![]() |
| Wall preparation - smoothing all... |
![]() |
| The overhead light gave these a yellow tint, but the subway tile is white and the decorative accent is white marble... |
Adam indicated once the wall prep is complete the tiling is going to go fast. We can't wait!
Ciao!
Monday, August 18, 2014
Bathroom Progress
![]() |
| Old galvanized pipe... |
We found our tub installed!
Plumbing is installed.
Backer board is going up!
![]() |
| Collateral damage |
Next up...tiling...we'll be in touch.
Ciao.
Monday, August 4, 2014
Find My Tub!
Wednesday, July 23, 2014
Tub Has Arrived
Saturday, July 19, 2014
We're At It Again
We just finished a visit with Laura at 8 LP Design. She assisted us in finding and ordering a pendant light to go over the kitchen sink, under cabinet lighting, and a hallway ceiling light. Can't wait until Mr. Contractor gets all this installed, but that means the bathroom has to be finished first.
The bathroom has been almost completely gutted. As you can see in the image above, we're going to reuse the sink and toilet - they're in great shape - no reason to replace.
It's amazing how bleak it looks when torn down to the studs. We found some old pics of the bathroom as it was when we bought the house and will post some of those as time permits. So, the next step is for the plumber to rough-in the plumbing apparatus.
That's all we've got for now.
Ciao!