We just finished a visit with Laura at 8 LP Design. She assisted us in finding and ordering a pendant light to go over the kitchen sink, under cabinet lighting, and a hallway ceiling light. Can't wait until Mr. Contractor gets all this installed, but that means the bathroom has to be finished first.
The bathroom has been almost completely gutted. As you can see in the image above, we're going to reuse the sink and toilet - they're in great shape - no reason to replace.
It's amazing how bleak it looks when torn down to the studs. We found some old pics of the bathroom as it was when we bought the house and will post some of those as time permits. So, the next step is for the plumber to rough-in the plumbing apparatus.
That's all we've got for now.
Ciao!